Building & pad
Grade shots at building corners
Front-left
Front-right
Back-left
Back-right
Trucking & price
Jobs
Saving writes a .json job file (and keeps a copy in this browser). Put the file in the fill-calc/jobs folder, or anywhere another device can reach, then use Open job file there.
Results
Fill
–
Fill truck loads
–
Finish material
–
Material cost
–
| Pad size | |
| Pad area | |
| Average fill depth | |
| Cut (ground above pad) | |
| Finish material depth | |
| Finish material truck loads |
Corner shots are taken at the four building corners. Ground under the pad margins follows the nearest building edge unless you tap extra shots there in 3D.
Tap the pad where the reading was taken
added shots + surface lines
existing ground
pad floor / cut face
fill
finish material
building